Project Name

Piping Design for Toothpaste Tube Filling Line

Client

Unilever Oregun

Location

Lagos State, Nigeria

Date(s)

August - December 2025

Hygienic Process Piping & Utility Integration
Project Overview

Graceberg Projects Limited provided process piping engineering and utility integration support for the installation of a new Toothpaste Tube Filling and Packaging Line at the Unilever Oregun Factory in Lagos, Nigeria. The project required hygienic product piping systems, utility integration, and coordinated installation planning within an existing operational production facility.

The engineering scope focused on ensuring efficient product transfer, optimized utility routing, and safe system integration while minimizing operational disruption within the active manufacturing environment.


Client

Unilever Oregun


Project Scope

Graceberg Projects Limited provided engineering consultancy and technical design services covering:

Process Piping Engineering
  • Hygienic process piping system design
  • Product and utility piping integration
  • Piping routing and layout coordination
  • Fabrication and installation drawing development
Engineering Design Documentation
  • General Arrangement (GA) drawings
  • Process Flow Diagrams (PFDs)
  • Piping & Instrumentation Diagrams (P&IDs)
  • Equipment layout and utility tie-in documentation
Technical Engineering Support
  • Pipe sizing and utility coordination
  • Welding Procedure Specification (WPS) support
  • Corrosion protection recommendations
  • Hygienic piping standards coordination
Project Documentation & Planning
  • BOQ preparation for piping and installation materials
  • Utility integration planning
  • Installation coordination support
  • Technical specification development

Engineering Capabilities Applied

This project demonstrated Graceberg Projects Limited’s expertise in:

  • Hygienic process piping systems
  • Utility systems integration
  • Industrial production line engineering
  • PFD & Intelligent P&ID development
  • Piping fabrication documentation
  • Equipment and utility coordination
  • BOQ preparation and technical documentation
  • Installation planning within live production environments

 
Project Significance

This project highlights our capability to deliver detailed engineering solutions for hygienic production facilities requiring:

  • Accurate utility and process integration
  • Safe tie-ins within existing operational facilities
  • Efficient product transfer systems
  • Coordinated piping installation planning
  • Compliance with hygienic production standards

The engineering design enabled efficient integration of the new toothpaste filling line while supporting operational continuity and optimized utility distribution within the facility.


Key Systems Integrated
  • Hygienic Product Piping Systems
  • Utility Distribution Networks
  • Process Utility Tie-ins
  • Equipment Layout Coordination
  • Piping Fabrication & Installation Systems
  • Utility Routing Infrastructure

Strategic Importance

The Toothpaste Tube Filling Line project demonstrates Graceberg Projects Limited’s ability to support high-performance manufacturing environments through technically coordinated process piping engineering and utility integration services.